在樣式表裡 對header進行樣式改寫 類名是to通民p-fixed 寫法: .header.top-fi外事xed

Handrail

Ball joint handrail is 是林manufactured with specialized produ師那ction line, featured with advant少熱ages of pleasant appearance, easy 低也installation and great務微 durability. Carbon steel hand紙下rail is normally hot-dip 北劇galvanized for saving maintenanc麗問e. This type of products is in acco白看rdance with GB 17888.3-199可藍9, being extensively 行朋applied in industrial and civil co拿習nstruction including sew女車age treatment, water supply, g好都ardening, public roa對花d, mining, power plant習南, petrochemical, mechanical indus時道try, ship building, highway, railway, b大又ridge, airport and quay, etc. For s民個tainless steel handrail, t作少he surface can be treated in accordan外關ce with requirements for environment街話 protection.


image


  • Designation
  • Types And Dimensitons
  • Stanchion Types
  • Bends And Base Paltes
  • Installation Guide
  • Application case

Note:

1.Steel Pipe Dimensions:個開 In the above table, dimensions be慢空fore the bracket are for carbon ste一匠el, while those in the br話雜acket are for stainless&n書不bsp; steel. However, all final dimensio頻場ns must be subject to drawin輛街g confirmation of both partie在小s.

2. Stanchion Spacing票飛: 1,000, 1,200 and 1,500 mm

3. Height of Handrail:

   (1) Doub她畫le Rails

  A. Horizontal Handrail: with a mini暗得mum height of 1,100 m關如m for the handrail

  B. Angled Handrail: with a minim空們um vertical height of 離頻900mm for handrail

   (2) Three Rails還快: generally 1,200mm

   (3) Singl湖員e rail or more than 3 rails are sub話請ject to specific design.

4. Joint of Rail and Stanchion雪車:

   (1) Wel信如ding is generally adopted f友能or joints with parcel antirust treatmen雨少t.

   (2) Bol船村ts or pins are optional, with necessa亮遠ry holes to be drilled at site 離遠for installation.

5. If customer reduces the height of ha鐘河ndrail or the thickness吧長 of steel tube, or inc跳農reases the main stanchion pitc我務h, etc. so as to save cost, Wellt書冷er will not be responsible畫相 for any consequences incu地南rred.


10026484030

I. Horizontal Work

1. Where there is suffi又歌cient room...

(1) Space out stanchions and lay rail也術 tubes alongside where handrail is to b唱站e erected.

(2) Pull stanchion onto pipe愛頻 from either end to oppo上紙site where they are to be 間靜fixed.

(3) Stand up system and temporarily bo分我lt both end stanchions for safe聽現ty.

(4) Position and bolt inter我鄉mediate stanchions. Pack either side 數費of base plate with shims to ali這小gn system if necessary.

2. Where there is insuff也銀icient room ...

(1) Fix the end stanchion訊友 securely in position, then feed both 了但handrail and kneerail into st放鐵anchion while supporting other費子

end of pipe until other st下跳anchions can be placed.

(2) Place a brick or similar su快窗pport under base plate until nex stanch輛黃ion is fed onto pipe.

(3) Move brick to this stanchion 站些and proceed to pull previous stanchio些謝n along pipe to its fin用美al position.

(4) Bole loosely and repea舊近t operation as previou靜會s sequence.

II. Stairway Work

(1) Start at bottom of first fl草間ight and work up for 算能SAFETY.

(2) Bolt bottom stanchion securely 匠體in position, then the second sta現雪nchion loosely in position.

(3) Feed the pipe down through 體去No. 2 stanchion and just enter No. 1 森知halfway. Allow free end t就醫o hang.

(4) Feed mid rail through木坐 No. 2 stanchion and right thro近如ugh No. 1 approx. 75mm.

(5) Fit and securely fix angle closure可中r bend, either by slip joint and taperp和校in or tack welding.

(6) Feed and fix additional stanchi花那on and tighten.